Arizona Department of Transportation
Arizona Department of Transportation
Intermodal Transportation Division
Arizona @ Your Service

Keyword Search   Go
ITD - Highways Home Page
About ITD

Districts

Employment

Environment

Inside ITD

Maintenance

Maps

Active Project Information

Road Closures

Valley Freeways
 az511  az511
Adopt a Highway Program

 Adopt
 a
Highway
Program

I-17: New River Traffic Interchange to
Junction SR 69 (Cordes Junction)

Design Concept Report and Environmental Studies
Project No. STP-017-A(ARV)
TRACS No. 17 MA 232 H6800 01L

Purpose of Project

The purpose of this project is to add capacity to and improve operations of I-17 from Milepost (MP) 232 to MP 262.

Project Description

The purpose of this study is to prepare a design concept report and environmental documentation for improvements to the segment of Interstate 17 between the New River Traffic Interchange (TI) (MP 232) and the Cordes Junction TI (MP 262+), a length of approximately 30 miles. This section of I-17, designated the "Arizona Veteran's Highway" in 2004, currently consists of two lanes in each direction, traversing rolling terrain in the southern and northern segments and mountainous terrain in the middle of the project.

I-17 is part of the National Highway System and connects I-10 with I-40, two of the nation's principal east-west interstate highways. I-17 also provides the major connection between Phoenix and communities in northern Arizona. This project will explore various means of adding capacity to I-17.

The study segment is located in a rural area of Maricopa and Yavapai counties. The Agua Fria National Monument, administered by the Bureau of Land Management, is located immediately east of the I-17 right-of-way from approximately MP 245 to MP 260.

Frequently Asked Questions

Public Meetings

A newsletter will be prepared and sent to participants on the project mailing list in the near future. The public hearing is currently scheduled for Spring 2009.

If you would like to be invited to a public meeting or receive a newsletter, please send us an email with your name and address.


Publications

 
Alternative Selection Report
(includes Environmental Overview)
Section 5.2.2 revised November 5, 2007
 
Current Alternative Alignments ~ November 2008
(Alternative H eliminated from further consideration)

Study Timeline - July 2008

Winter 2007/Summer 2008
  Prepare preliminary engineering and environmental documents
   
Fall 2008
 

The study teams continue research and evaluation

   
Spring 2009
  Public Hearing
   
Fall 2009
  Finalize documents; agency acceptance


Contact Information

Project Comment Line
(toll free)
866.751.2215

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation All Rights Reserved